Skip to main content
Uncategorized

Temco Wire Products go live in October 2026 with 393 MWh of annual solar generation

By September 28, 2026No Comments

A long term goal and drive towards our Net Zero objectives, Temco Wire Products has installed during the last 8 weeks a solar system including 781 panels that are forecast to deliver approximately 393 MWh of annual solar generation, providing significant long-term electricity cost savings and an estimated 4-year payback period.

Along with the solar install we have invested in a roof redesign including a fall arrest system as part of the current project which ensures a maintained safe access routes across the roof and preserving long-term maintenance flexibility.